![]() Peak Season means the weeks containing the 24th through 36th Wednesdays of the calendar year. Toilet room means a room containing a water closet and a wash basin.īreak Costs means the amount (if any) by which: Provide a 3/4 horse-power garbage disposal at Break Room and pantry sinks.īreak Date means 1 anniversary of that date] ]2īreak means a period of time within a flight duty period, shorter than a rest period, counting as duty and during which a crew member is free of all tasks īreak-Up Fee shall have the meaning set forth in Section 7.1. Reception Area, Lobbies, Elevator, Offices and Break Room Service Hours: 5PM – 7AM a. ![]() Wipe clean Lobby, Break Room, and employee chairs with disinfectant cleaner (including legs, backs, and underside). Residents who have been relocated for the Interim Break must move back to their Academic Year Room and return the Interim Break Room key to the Housing Service Center by noon on opening day. The building at 14 3rd Street NW (the former Break Room) has eight (8) existing residential units. ![]() Refrigerators and microwave ovens are approved purchases when equipping a Break Room. The campus consists of a reception area, 6 classrooms which include a Medical Laboratory and a Computer Lab, a Library Resource Center, a Break Room and 5 Administrative Offices. Ft:-Carpet: 6,696-Ceramic: 1,488-VCT: 2,808-Vinyl: 1,972-Terrazzo: 3,992-Cement: 2,808 Total Cleanable Square Feet: 19,764 Areas to be serviced: Admin West, Admin East, Front Entrance/Reception, Main Hall Offices and Common Areas, Locker Rooms, Maintenance/Laundry Hall Offices and Common Areas, Back Hall Offices and Common Areas, Therapy Room, Break Room, Front and Rear Exterior Porches C.Ĭorporation Yard: HVAC and piping insulation within the D/S Building Hot water piping insulation in Building F - Transportation Shop Floor tile and mastic Building F - Transportation Shop – Break Room Mastic under floor tile - second floor of Building I – Warehouse and Pre-Fab Shop linoleum on restroom floor.Ĭorporation Yard: ∗ HVAC and piping insulation within the D/S Building ∗ Hot water piping insulation in Building F - Transportation Shop ∗ Floor tile and mastic Building F - Transportation Shop – Break Room ∗ Mastic under floor tile - second floor of Building I – Warehouse and ∗ Pre-Fab Shop linoleum on restroom floor.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |